Borehole Number: |
Coordinates Type: WGS 84 |
Coordinates Format: Decimal Degrees (DD) |
Coordinates: -21.88246 , 27.93257 |
Location: Mmadinare |
Location Description: MOTLOUTSE RIVER |
Start Drill: 2006-05-31 |
End Drill: 2006-05-31 |
Borehole Type: Groundwater |
Drilling Method: Percussion |
Drilling Rig(s): N/A |
Sample Type: Water |
Depth of Surface Casing: N/A |
Hole Inclination: N/A |
Estimated Yield: N/A |
Static Water Level: 14.44 m |
Borehole Water Strike: 13 Metres |
End of Hole (Depth): 30 Metres |
Hole Diameter: 16.5 Millimetres |
Log Formation: |
No. | From (m) | To (m) | Log Formation |
---|
1. | 0 | 1 | Dark Loamy Soil |
2. | 1 | 3 | Gneiss + Granite |
3. | 3 | 6 | Mica + Quartzite +Granite |
4. | 6 | 9 | Mica + Quartzites + Granite |
5. | 9 | 12 | Mica + Quartzites + Granite + Gneiss |
6. | 12 | 15 | Mica + Quartzites + Granite + Gneiss |
7. | 15 | 18 | Mica + Quartzites + Granite + Gneiss |
8. | 18 | 30 | Mica + Quartzites + Granite + Gneiss |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer