Borehole Number: |
Coordinates Type: WGS 84 |
Coordinates Format: Decimal Degrees (DD) |
Coordinates: -25.26735 , 25.11564 |
Location: Tsatsu |
Location Description: TSATSU GATE |
Start Drill: 1997-10-21 |
End Drill: 1997-10-22 |
Borehole Type: Groundwater |
Drilling Method: Percussion |
Drilling Rig(s): N/A |
Sample Type: Water |
Depth of Surface Casing: N/A |
Hole Inclination: N/A |
Estimated Yield: N/A |
Static Water Level: 44.13 m |
Borehole Water Strike: N/A |
End of Hole (Depth): 60 Metres |
Hole Diameter: N/A |
Log Formation: |
No. | From (m) | To (m) | Log Formation |
---|
1. | 0 | 1 |
2. | 0 | 1 |
3. | 1 | 2 |
4. | 1 | 2 |
5. | 2 | 4 |
6. | 2 | 4 |
7. | 4 | 5 |
8. | 4 | 5 |
9. | 5 | 10 |
10. | 5 | 10 |
11. | 10 | 18 |
12. | 18 | 21 |
13. | 21 | 33 |
14. | 33 | 35 |
15. | 35 | 41 |
16. | 41 | 44 |
17. | 44 | 50 |
18. | 50 | 60 |
© Botswana Geoscience Institute 2024 | www.bgi.org.bw | Disclaimer