Borehole Number: |
Coordinates Type: WGS 84 |
Coordinates Format: Decimal Degrees (DD) |
Coordinates: -25.532083 , 25.612139 |
Location: Pitsane |
Location Description: PITSANE |
Start Drill: 2005-10-21 |
End Drill: 2005-10-24 |
Borehole Type: Groundwater |
Drilling Method: Percussion |
Drilling Rig(s): N/A |
Sample Type: Water |
Depth of Surface Casing: N/A |
Hole Inclination: N/A |
Estimated Yield: 0.122 M3/hr |
Static Water Level: 19.64 m |
Borehole Water Strike: 30 Metres |
End of Hole (Depth): 100 Metres |
Hole Diameter: 254 Millimetres |
Log Formation: |
No. | From (m) | To (m) | Log Formation |
---|
1. | 0 | 1 | Brown lateritic soils |
2. | 1 | 23 | Red weathered granite |
3. | 23 | 34 | Fresh pink granite |
4. | 34 | 35 | Light grey weathered dolerite |
5. | 35 | 65 | Grey fresh dolerite |
6. | 65 | 75 | Pink granite |
7. | 75 | 100 | Dark grey fresh dolerite |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer