| Borehole Number: |
| Coordinates Type: WGS 84 |
| Coordinates Format: Decimal Degrees (DD) |
| Coordinates: -25.50175 , 25.607611 |
| Location: Pitsane |
| Location Description: PITSANE |
| Start Drill: 2005-10-27 |
| End Drill: 2005-11-04 |
| Borehole Type: Groundwater |
| Drilling Method: Percussion |
| Drilling Rig(s): N/A |
| Sample Type: Water |
| Depth of Surface Casing: N/A |
| Hole Inclination: N/A |
| Estimated Yield: 1.8 M3/hr |
| Static Water Level: 13.43 m |
| Borehole Water Strike: 60 Metres |
| End of Hole (Depth): 100 Metres |
| Hole Diameter: 254 Millimetres |
| Log Formation: |
| No. | From (m) | To (m) | Log Formation |
|---|
| 1. | 0 | 4 | Calcrete |
| 2. | 4 | 26 | Weathered granite |
| 3. | 26 | 30 | Fresh granite |
| 4. | 30 | 31 | Weathered dolerite |
| 5. | 31 | 34 | Fresh dolerite |
| 6. | 34 | 40 | Fresh granite |
| 7. | 40 | 85 | Fresh dolerite |
| 8. | 85 | 100 | Fresh granite |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer