| Borehole Number: |
| Coordinates Type: WGS 84 |
| Coordinates Format: Decimal Degrees (DD) |
| Coordinates: -25.42072 , 25.61481 |
| Location: Pitsane |
| Location Description: PITSANE BDF CAMP |
| Start Drill: 2005-11-17 |
| End Drill: 2005-11-17 |
| Borehole Type: Groundwater |
| Drilling Method: Percussion |
| Drilling Rig(s): N/A |
| Sample Type: Water |
| Depth of Surface Casing: N/A |
| Hole Inclination: N/A |
| Estimated Yield: 0.321 M3/hr |
| Static Water Level: 42.17 m |
| Borehole Water Strike: 42 Metres |
| End of Hole (Depth): 175 Metres |
| Hole Diameter: 305 Millimetres |
| Log Formation: |
| No. | From (m) | To (m) | Log Formation |
|---|
| 1. | 0 | 1 | Brown soil |
| 2. | 1 | 5 | Red clays |
| 3. | 5 | 25 | Grey weathered felsite |
| 4. | 25 | 30 | Pale green weathered felsite |
| 5. | 30 | 56 | Purple grey felsite |
| 6. | 56 | 144 | Fresh dolerite |
| 7. | 144 | 175 | Fresh pink felsite |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer