| Borehole Number: |
| Coordinates Type: WGS 84 |
| Coordinates Format: Decimal Degrees (DD) |
| Coordinates: -25.45403 , 25.61617 |
| Location: Pitsane |
| Location Description: PITSANE |
| Start Drill: 2005-11-24 |
| End Drill: 2005-11-03 |
| Borehole Type: Groundwater |
| Drilling Method: Percussion |
| Drilling Rig(s): N/A |
| Sample Type: Water |
| Depth of Surface Casing: N/A |
| Hole Inclination: N/A |
| Estimated Yield: 0.169 M3/hr |
| Static Water Level: 56.47 m |
| Borehole Water Strike: 29 Metres |
| End of Hole (Depth): 100 Metres |
| Hole Diameter: 165 Millimetres |
| Log Formation: |
| No. | From (m) | To (m) | Log Formation |
|---|
| 1. | 0 | 2 | Brown lateritic soil |
| 2. | 2 | 6 | Brown clays |
| 3. | 6 | 21 | Light grey weathered dolerite |
| 4. | 21 | 100 | Greenish grey dolerite (fresh) |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer