Borehole Number: |
Coordinates Type: WGS 84 |
Coordinates Format: Decimal Degrees (DD) |
Coordinates: -21.11728 , 24.33644 |
Location: Xere |
Location Description: XERE |
Start Drill: 2003-02-08 |
End Drill: 2003-08-19 |
Borehole Type: Groundwater |
Drilling Method: Percussion |
Drilling Rig(s): N/A |
Sample Type: Water |
Depth of Surface Casing: N/A |
Hole Inclination: N/A |
Estimated Yield: 6.47 M3/hr |
Static Water Level: N/A |
Borehole Water Strike: 204 Metres |
End of Hole (Depth): 300 Metres |
Hole Diameter: 20.3 Millimetres |
Log Formation: |
No. | From (m) | To (m) | Log Formation |
---|
1. | 0 | 1 |
2. | 1 | 12 |
3. | 12 | 28 |
4. | 28 | 36 |
5. | 36 | 40 |
6. | 40 | 46 |
7. | 46 | 55 |
8. | 55 | 76 |
9. | 76 | 113 |
10. | 113 | 116 |
11. | 116 | 119 |
12. | 119 | 143 |
13. | 143 | 173 |
14. | 173 | 205 |
15. | 205 | 211 |
16. | 211 | 225 |
17. | 225 | 250 |
18. | 250 | 260 |
19. | 260 | 271 |
20. | 271 | 285 |
21. | 285 | 300 |
© Botswana Geoscience Institute 2024 | www.bgi.org.bw | Disclaimer