Borehole Number: |
Coordinates Type: WGS 84 |
Coordinates Format: Decimal Degrees (DD) |
Coordinates: -23.05143 , 22.0522 |
Location: Bere |
Location Description: LONE TREE |
Start Drill: 2005-10-22 |
End Drill: 2005-10-30 |
Borehole Type: Groundwater |
Drilling Method: Percussion |
Drilling Rig(s): N/A |
Sample Type: Water |
Depth of Surface Casing: N/A |
Hole Inclination: N/A |
Estimated Yield: 9.1 M3/hr |
Static Water Level: N/A |
Borehole Water Strike: 168 Metres |
End of Hole (Depth): 209 Metres |
Hole Diameter: 16.5 Millimetres |
Log Formation: |
No. | From (m) | To (m) | Log Formation |
---|
1. | 0 | 11 |
2. | 11 | 32 |
3. | 32 | 55 |
4. | 55 | 60 |
5. | 60 | 62 |
6. | 62 | 73 |
7. | 73 | 81 |
8. | 81 | 121 |
9. | 121 | 127 |
10. | 127 | 138 |
11. | 138 | 144 |
12. | 144 | 146 |
13. | 146 | 161 |
14. | 161 | 164 |
15. | 164 | 170 |
16. | 170 | 207 |
17. | 207 | 209 |
© Botswana Geoscience Institute 2024 | www.bgi.org.bw | Disclaimer