| Borehole Number: |
| Coordinates Type: WGS 84 |
| Coordinates Format: Decimal Degrees (DD) |
| Coordinates: -24.43861 , 26.06778 |
| Location: Morwa |
| Location Description: MORWA |
| Start Drill: 1970-08-17 |
| End Drill: 1970-08-18 |
| Borehole Type: Groundwater |
| Drilling Method: Percussion |
| Drilling Rig(s): N/A |
| Sample Type: Water |
| Depth of Surface Casing: N/A |
| Hole Inclination: N/A |
| Estimated Yield: 0.23 M3/hr |
| Static Water Level: 21.3 m |
| Borehole Water Strike: 33.53 Metres |
| End of Hole (Depth): 76.2 Metres |
| Hole Diameter: 152 Millimetres |
| Log Formation: |
| No. | From (m) | To (m) | Log Formation |
|---|
| 1. | 0 | 76.2 | Granite |
© Botswana Geoscience Institute 2025 | www.bgi.org.bw | Disclaimer